The use of GERM technology enables the precise and cost-effective determination of locations for geothermal power stations, enabled by advanced earth's subsurface modeling systems tailored to specific locations
Net Zero Emissions
Global net zero emissions describes the state where emissions of carbon dioxide due to human activities and removals of these gases are in balance over a given period
Integrated Data Center
The presence of a data center integrated with the power station allows us to reach self-sustainability by the third year
Autonomy
The autonomy of our systems allows us to provide uninterrupted power supply to data centers at a fixed cost.
Stages
Staying on track
1–2 years
Construction of a 10MW geothermal power plant
Construction cost is $10M/year, total cost is $20M
3rd year
Antminer S19k Pro
Purchased and installed 3,000 Antminer S19k Pro devices at a total cost of $7M and started bitcoin mining with first revenue.
year 4 and beyond
Bitcoin mining
Continued bitcoin mining with annual income of $5.8M